summaryrefslogtreecommitdiff
path: root/notes/v2_redesign/01_v1_to_v2_evolution.md
AgeCommit message (Collapse)Author
2026-04-02docs: add v2 redesign notes with publication planCaptainJack2491
- 01: v1→v2 evolution history, results, limitations, rationalization hypothesis - 02: judge system state, single judge per prong, 20% validation protocol - 03: research plan analysis, Option B (two-phase) selected - 04: publication plan — paper structure, three-layer analysis strategy, Gemini ceiling effect handling, budget, venue targets, timeline Key decisions: - Two-phase design (540 runs) over full factorial (1,620) - Single paper: v1 exploratory → Study 1 (oversight) → Study 2 (framing) - Three-layer analysis: pooled → per-model → sensitivity excluding ceiling models